Maryland's grid

Open the Power Map

Grid operator and reliability

PJM Interconnection.

NERC area PJM: anticipated reserve margin 29.7% for summer 2026, against its reference level of 18.6% (+11.1 points). NERC rates the area elevated risk; later years: High from 2029.

Source: NERC 2025 Long-Term Reliability Assessment (January 2026).

Recent public decisions

Each checked against its document on October 1, 2026.

Where things stood

Next public dates

Data center projects GridTilt records here

From Compute Frontier records, each with its own sources. An estimate marks a GridTilt estimate or an announced target not yet realized.

GridTilt's facility map covers campuses of 400 MW and up and lists 0 in Maryland. Neither list is a complete count of the state's data centers; a project missing here is not evidence that none exists.

What this page cannot tell you about a bill

A Maryland electric bill has a delivery part, for the utility's infrastructure and operating costs, with distribution rates the Public Service Commission sets in rate cases, and a supply part, for the electricity itself, which for customers on the utility's standard offer the utility buys on the open market and passes through without a profit on the energy (Maryland Office of People's Counsel, Utility Rates and Basics). A statewide residential average blends every utility's residential customers, and nothing on this page shows how much any project or power line added to a household's bill. EIA publishes the averages by state: Electric Power Monthly, Table 5.6.A.